Melbourne remains the heart of Australia's manufacturing industry, with dynamic hubs in Dandenong South, Campbellfield, and Braeside. As Victorian enterprises pivot towards "Advanced Manufacturing," the demand for precision tooling and injection molding storage has surged. In these high-rent industrial zones, vertical space optimization isn't just a convenience—it's a financial necessity.
Traditional shelving fails to meet the safety and weight requirements of heavy metal molds. Our Mould Racking Systems are designed specifically for the Melbourne market, adhering to local safety expectations and AS 4084 steel storage racking standards. By implementing drawer-type systems, factories can reduce mold changeover times by up to 40%, directly impacting the bottom line of injection molding and metal stamping operations.
Structural integrity designed for long-term stability in busy Victorian warehouses.
Bespoke layouts tailored for compact Melbourne industrial units.
Safety locking mechanisms to prevent accidental drawer slippage during hoisting.
The future of mould storage is Intelligence. Our technical roadmap for 2024-2025 focuses on integrating storage systems with Industry 4.0 protocols. We are currently developing "Smart Racking" prototypes that feature:
For Melbourne businesses, this means transitioning from passive storage to an active component of the production line. Our Customizable Heavy Duty Mould Racks are the first step in this journey, providing the rigid foundation required for future automation upgrades.
Guangzhou Xinmiao Storage Equipment Co., Ltd. leverages the "Factory 4.0" model to ensure that our Melbourne clients receive world-class products at competitive prices. Our facility in Guangzhou is a masterclass in modern manufacturing efficiency:
By choosing a factory-direct exporter, Melbourne enterprises bypass the "middleman markup" while gaining direct access to the engineering team that designed their system.
Guangzhou Xinmiao Storage Equipment Co., Ltd. is a professional manufacturer specializing in warehouse storage solutions, industrial racks, and customized shelving systems. Established in 2016, we have accumulated years of experience in designing, manufacturing, and exporting high-quality storage equipment for global customers.
Our factory covers an area of approximately 18,500㎡, equipped with advanced production facilities, automated processing equipment, and a professional quality management system. With an annual export revenue of around USD 12 million, we have built strong partnerships with customers from different industries worldwide. We have 8 years of export experience and 12 years of industry experience, providing reliable storage solutions for warehouses, factories, logistics centers, retail stores, and distribution facilities.
To ensure consistent product quality, we implement strict quality control procedures throughout the entire production process. Our quality inspection system includes raw material testing, welding inspection, dimensional measurement, surface coating inspection, load-bearing tests, and finished product evaluation. We use advanced inspection methods such as laser measurement, load testing equipment, and visual quality inspection to guarantee product safety and durability. Our dedicated quality control team consists of 45 professional inspectors.








Our expertise extends beyond just "selling racks." We provide Macro Industry Solutions that encompass the entire lifecycle of industrial tooling. For global enterprises operating in Melbourne, we offer a "Supply Chain Resilience" package that includes:
Our standard heavy-duty mould racks support 1,000kg to 3,000kg per layer. However, we can customize systems for ultra-heavy moulds exceeding 5,000kg using reinforced structural steel and specialized bearing systems.
Yes. While manufactured in China, our systems are engineered to meet or exceed the requirements of AS 4084-2012 and the updated 2023 standards for steel storage racking, ensuring safety and compliance for Melbourne warehouses.
From our Guangzhou factory, production typically takes 15-20 days. Shipping to the Port of Melbourne usually takes an additional 14-21 days. We offer full logistics support, including customs clearance documentation.
Absolutely. Our mould racks are frequently designed with top-mounted hoist rails or are spaced to accommodate existing gantry cranes within your facility.
We provide detailed 3D installation guides and video walkthroughs. For large-scale projects, we can partner with local Melbourne racking installers to ensure a professional and certified setup.